The project consists of one, 2-story medical office building/clinic encompassing 38,418 GSF of interior space. The first floor includes 42 exam rooms organized into 9 Pods. Also on the first level are 2 X-ray rooms along with support spaces and offices. The second floor includes 32 more exam rooms organized into 6 Pods. A third x-ray room provides support to the second level. A formal conference room sits in one corner of the second level. The structural systems start with conventional shallow spread footings supporting a structural steel frame. The ground floor level is a 4” concrete slab on grade, the second is a metal deck and concrete system supported by bar joist. The roof consists of bar joist supporting metal deck with insulation and roofing membrane providing weather-tightness. Architectural features include a two story atrium waiting area, a dramatic covered entrance and large areas of full height curtain-wall and glazing.

CURRENT STATUS (as of 10/8/19)

During the month of September, sequence 7 structural steel has been completely erected. First floor interior framing was complete, and second floor framing continues. Electrical and plumbing inspections have been completed on the first floor, and second floor inspections are scheduled for early October. The duct work on the first floor is nearly complete, and the pressure test is scheduled for early October. Second floor duct work is underway. Interior fire protection is scheduled to begin either late September or early October. Exterior sheathing was started along the norther face of the building. The monthly safety lunch was held at the job trailer.