Client:School Board of Monroe County
Location :Key West, Florida
Budget :$37,283,239
Architect :Harvard Jolly Architecture
Completion :August 2020

Monroe County Schools Stanley Switlik Elementary School

This project encompasses the partial replacement and renovations to an existing school, reconfigured and added parking areas and the addition of a bus maintenance facility totaling 87,554 SF.

The current two story administration building will be demolished and replaced by two buildings, a single story administration building and a two story classroom building. Another existing two story classroom building and the cafeteria building will be renovated. New construction is to be tilt wall panels with standing seam and metal roofs, impact windows and state of the art audio/visual systems in each classroom utilizing promethean boards and teaching walls. The site will be raised five feet above current conditions to address storm surge and potential flooding issues in the Florida Keys. The existing school will remain occupied and operational during construction requiring a multi-phased construction sequence.

Click HERE for the job site webcam.

CURRENT STATUS (as of 8/1/19)

Building 1 interior walls are primed and 1st coat of paint has been applied. Building 1 MEP trim out and hard tile is in progress. Building 1 HVAC start up has been completed. Building 1 standing seam roof and gutters are complete. Building 1 exterior prime paint coat is in progress. Building 2 first floor MEP rough in inspections are 100% complete and 2nd floor are on going. Building 2 first floor walls are being sanded and primed. Building 2 wall finishing is nearing completion. Building 2 Interior framing is 95% complete. Building 4 group bathroom renovation is 100% complete. Cafeteria/kitchen ceiling is 100% complete. New projection screen and projector have been installed. Building 5 underground storm drainage is 100% complete and. East parking lot asphalt is underway. Site canopy footings and concrete columns are in progress.